{"id":40185,"date":"2024-10-08T11:07:55","date_gmt":"2024-10-08T05:37:55","guid":{"rendered":"https:\/\/flattrade.in\/kosh\/?p=40185"},"modified":"2024-10-08T11:07:55","modified_gmt":"2024-10-08T05:37:55","slug":"garuda-construction-and-engineering-ipo","status":"publish","type":"post","link":"https:\/\/flattrade.in\/kosh\/garuda-construction-and-engineering-ipo\/","title":{"rendered":"Garuda Construction and Engineering IPO"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"40185\" class=\"elementor elementor-40185\">\n\t\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-60dbc001 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"60dbc001\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-64ce8f84\" data-id=\"64ce8f84\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-687dcfc elementor-widget elementor-widget-text-editor\" data-id=\"687dcfc\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"color: #000000;\">Garuda Construction and Engineering IPO is a book-built issue of Rs 264.10 crores. The issue is a combination of a fresh issue of 1.83 crore shares aggregating to Rs 173.85 crore and an offer for sale of 0.95 crore shares aggregating to Rs 90.25 crore.<\/span><\/p><p><span style=\"color: #000000;\">The \u00a0IPO opens for subscription on October 8, 2024, and closes on October 10. The price band for the IPO is set at \u20b992 to \u20b995 per share. The minimum lot size for an application is 157 Shares.<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-09852c2 elementor-widget elementor-widget-text-editor\" data-id=\"09852c2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"color: #000000;\"><strong>Company Summary<\/strong><\/span><\/p><p><span style=\"color: #000000;\">Garuda Construction and Engineering Limited was founded in 2010 and is a construction company that provides comprehensive construction services for residential, commercial, residential\/commercial, infrastructure, and industrial projects, as well as additional services for infrastructure and hospitality projects.<\/span><\/p><p><span style=\"color: #000000;\">The company also provides services such as operation and maintenance (O&amp;M) and mechanical, electrical and plumbing (MEP) services as well as finishing works as part of construction services.<\/span><\/p><p><span style=\"color: #000000;\">The company has a strong track record in various construction projects, including Golden Chariot Vasai Hotel &amp; Spa and Golden Chariot Boutique Hotel in 2015. Since 2017, the company has undertaken residential projects in MMR and completed two. From 2010 to 2017, the company focused on civil engineering in MMR, Karnataka and Tamil Nadu.<\/span><\/p><p><span style=\"color: #000000;\">The company recorded Revenue from Operations of Rs. 1,187.50 Lacs for the period ended April 30, 2024, Rs. 15,417.83 Lacs in FY 2024, and Rs. 16068.76 Lacs in FY 2023 which indicates a strong financial performance and healthy balance sheet<\/span><\/p><p><span style=\"color: #000000;\">As of September 28, 2024, the order value of the company&#8217;s ongoing and pending projects totaled Rs. 1,40,827.44 lacs. With projects spread across MMR, Arunachal Pradesh, Karnataka, Rajasthan, and Punjab, the increasing number of construction works and projects helped the company maintain its growth momentum and reputation.<\/span><\/p><p><span style=\"color: #000000;\">As of September 28, 2024, the company had 65 permanent employees<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ca325ac elementor-widget elementor-widget-text-editor\" data-id=\"ca325ac\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"color: #000000;\"><strong>Company Financials<\/strong><\/span><\/p><table><tbody><tr><td><span style=\"color: #000000;\"><strong><b>Period Ended<\/b><\/strong><\/span><\/td><td><span style=\"color: #000000;\"><strong><b>30 Apr 2024<\/b><\/strong><\/span><\/td><td><span style=\"color: #000000;\"><strong><b>31 Mar 2024<\/b><\/strong><\/span><\/td><td><span style=\"color: #000000;\"><strong><b>31 Mar 2023<\/b><\/strong><\/span><\/td><td><span style=\"color: #000000;\"><strong><b>31 Mar 2022<\/b><\/strong><\/span><\/td><\/tr><tr><td><span style=\"color: #000000;\"><strong><b>Assets<\/b><\/strong><\/span><\/td><td><span style=\"color: #000000;\">234.84<\/span><\/td><td><span style=\"color: #000000;\">228.49<\/span><\/td><td><span style=\"color: #000000;\">176.35<\/span><\/td><td><span style=\"color: #000000;\">111.03<\/span><\/td><\/tr><tr><td><span style=\"color: #000000;\"><strong><b>Revenue<\/b><\/strong><\/span><\/td><td><span style=\"color: #000000;\">11.88<\/span><\/td><td><span style=\"color: #000000;\">154.47<\/span><\/td><td><span style=\"color: #000000;\">161.02<\/span><\/td><td><span style=\"color: #000000;\">77.03<\/span><\/td><\/tr><tr><td><span style=\"color: #000000;\"><strong><b>Profit After Tax<\/b><\/strong><\/span><\/td><td><span style=\"color: #000000;\">3.5<\/span><\/td><td><span style=\"color: #000000;\">36.44<\/span><\/td><td><span style=\"color: #000000;\">40.8<\/span><\/td><td><span style=\"color: #000000;\">18.78<\/span><\/td><\/tr><tr><td><span style=\"color: #000000;\"><strong><b>Net Worth<\/b><\/strong><\/span><\/td><td><span style=\"color: #000000;\">122.51<\/span><\/td><td><span style=\"color: #000000;\">119.01<\/span><\/td><td><span style=\"color: #000000;\">82.61<\/span><\/td><td><span style=\"color: #000000;\">41.79<\/span><\/td><\/tr><tr><td><span style=\"color: #000000;\"><strong><b>Reserves and Surplus<\/b><\/strong><\/span><\/td><td><span style=\"color: #000000;\">85.16<\/span><\/td><td><span style=\"color: #000000;\">81.65<\/span><\/td><td><span style=\"color: #000000;\">70.13<\/span><\/td><td><span style=\"color: #000000;\">29.34<\/span><\/td><\/tr><tr><td><span style=\"color: #000000;\"><strong><b>Total Borrowing<\/b><\/strong><\/span><\/td><td><span style=\"color: #000000;\">0.15<\/span><\/td><td><span style=\"color: #000000;\">0.15<\/span><\/td><td><span style=\"color: #000000;\">0.19<\/span><\/td><td><span style=\"color: #000000;\">11.99<\/span><\/td><\/tr><tr><td colspan=\"5\"><p style=\"text-align: right;\"><span style=\"color: #000000;\">Amount in \u20b9 Crore<\/span><\/p><\/td><\/tr><\/tbody><\/table>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-628c429 elementor-widget elementor-widget-text-editor\" data-id=\"628c429\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"color: #000000;\"><strong>Objectives of the IPO<br \/><\/strong><\/span><span style=\"color: #000000;\">The Company proposes to utilize the funds being raised to fund the following objectives:<br \/><\/span><span style=\"color: #000000;\">1. Working Capital Requirements<br \/><\/span><span style=\"color: #000000;\">2. General Corporate Expenses and Unidentified Inorganic Acquisitions<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-9a6357e elementor-widget elementor-widget-text-editor\" data-id=\"9a6357e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"color: #000000;\"><strong>Promoters of the company<br \/><\/strong><\/span><span style=\"color: #000000;\">The Promoters of our Company are Pravinkumar Brijendra Kumar Agarwal, PKH Ventures Limited, Makindian Township Private Limited.<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-24e7c8e elementor-widget elementor-widget-text-editor\" data-id=\"24e7c8e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"color: #000000;\"><strong>IPO details<\/strong><\/span><\/p><table><tbody><tr><td><span style=\"color: #000000;\"><strong><b>IPO Date<\/b><\/strong><\/span><\/td><td><span style=\"color: #000000;\">October 8, 2024 to October 10, 2024<\/span><\/td><\/tr><tr><td><span style=\"color: #000000;\"><strong><b>Listing Date<\/b><\/strong><\/span><\/td><td><span style=\"color: #000000;\">Tuesday, October 15, 2024<\/span><\/td><\/tr><tr><td><span style=\"color: #000000;\"><strong><b>Face Value<\/b><\/strong><\/span><\/td><td><span style=\"color: #000000;\">\u20b95 per share<\/span><\/td><\/tr><tr><td><span style=\"color: #000000;\"><strong><b>Price Band<\/b><\/strong><\/span><\/td><td><span style=\"color: #000000;\">\u20b992 to \u20b995 per share<\/span><\/td><\/tr><tr><td><span style=\"color: #000000;\"><strong><b>Lot Size<\/b><\/strong><\/span><\/td><td><span style=\"color: #000000;\">157 Shares<\/span><\/td><\/tr><tr><td><span style=\"color: #000000;\"><strong><b>Total Issue Size<\/b><\/strong><\/span><\/td><td><span style=\"color: #000000;\">27,800,000 shares (aggregating up to \u20b9264.10 Cr)<\/span><\/td><\/tr><tr><td><span style=\"color: #000000;\"><strong><b>Fresh Issue<\/b><\/strong><\/span><\/td><td><span style=\"color: #000000;\">18,300,000 shares (aggregating up to \u20b9173.85 Cr)<\/span><\/td><\/tr><tr><td><span style=\"color: #000000;\"><strong><b>Offer for Sale<\/b><\/strong><\/span><\/td><td><span style=\"color: #000000;\">9,500,000 shares of \u20b95 (aggregating up to \u20b990.25 Cr)<\/span><\/td><\/tr><tr><td><span style=\"color: #000000;\"><strong><b>Issue Type<\/b><\/strong><\/span><\/td><td><span style=\"color: #000000;\">Book Built Issue IPO<\/span><\/td><\/tr><tr><td><span style=\"color: #000000;\"><strong><b>Listing At<\/b><\/strong><\/span><\/td><td><span style=\"color: #000000;\">BSE, NSE<\/span><\/td><\/tr><\/tbody><\/table>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c3da2a6 elementor-widget elementor-widget-text-editor\" data-id=\"c3da2a6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"color: #000000;\"><strong>Lot Allocation details<\/strong><\/span><\/p><table><tbody><tr><td><span style=\"color: #000000;\"><strong><b>Application<\/b><\/strong><\/span><\/td><td><span style=\"color: #000000;\"><strong><b>Lots<\/b><\/strong><\/span><\/td><td><span style=\"color: #000000;\"><strong><b>Shares<\/b><\/strong><\/span><\/td><td><span style=\"color: #000000;\"><strong><b>Amount<\/b><\/strong><\/span><\/td><\/tr><tr><td><span style=\"color: #000000;\"><strong><b>Retail (Min)<\/b><\/strong><\/span><\/td><td><span style=\"color: #000000;\">1<\/span><\/td><td><span style=\"color: #000000;\">157<\/span><\/td><td><span style=\"color: #000000;\">\u20b914,915<\/span><\/td><\/tr><tr><td><span style=\"color: #000000;\"><strong><b>Retail (Max)<\/b><\/strong><\/span><\/td><td><span style=\"color: #000000;\">13<\/span><\/td><td><span style=\"color: #000000;\">2041<\/span><\/td><td><span style=\"color: #000000;\">\u20b9193,895<\/span><\/td><\/tr><tr><td><span style=\"color: #000000;\"><strong><b>S-HNI (Min)<\/b><\/strong><\/span><\/td><td><span style=\"color: #000000;\">14<\/span><\/td><td><span style=\"color: #000000;\">2,198<\/span><\/td><td><span style=\"color: #000000;\">\u20b9208,810<\/span><\/td><\/tr><tr><td><span style=\"color: #000000;\"><strong><b>S-HNI (Max)<\/b><\/strong><\/span><\/td><td><span style=\"color: #000000;\">67<\/span><\/td><td><span style=\"color: #000000;\">10,519<\/span><\/td><td><span style=\"color: #000000;\">\u20b9999,305<\/span><\/td><\/tr><tr><td><span style=\"color: #000000;\"><strong><b>B-HNI (Min)<\/b><\/strong><\/span><\/td><td><span style=\"color: #000000;\">68<\/span><\/td><td><span style=\"color: #000000;\">10,676<\/span><\/td><td><span style=\"color: #000000;\">\u20b91,014,220<\/span><\/td><\/tr><\/tbody><\/table>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-996a24e elementor-widget elementor-widget-text-editor\" data-id=\"996a24e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"color: #000000;\"><strong>Allotment Schedule<\/strong><\/span><\/p><table><tbody><tr><td><span style=\"color: #000000;\"><strong><b>Basis of Allotment<\/b><\/strong><\/span><\/td><td><span style=\"color: #000000;\">Friday, October 11, 2024<\/span><\/td><\/tr><tr><td><span style=\"color: #000000;\"><strong><b>Initiation of Refunds<\/b><\/strong><\/span><\/td><td><span style=\"color: #000000;\">Monday, October 14, 2024<\/span><\/td><\/tr><tr><td><span style=\"color: #000000;\"><strong><b>The credit of Shares to Demat<\/b><\/strong><\/span><\/td><td><span style=\"color: #000000;\">Monday, October 14, 2024<\/span><\/td><\/tr><tr><td><span style=\"color: #000000;\"><strong><b>Listing Date<\/b><\/strong><\/span><\/td><td><span style=\"color: #000000;\">Tuesday, October 15, 2024<\/span><\/td><\/tr><tr><td><span style=\"color: #000000;\"><strong><b>Cut-off time for UPI mandate confirmation<\/b><\/strong><\/span><\/td><td><span style=\"color: #000000;\">5 PM on October 10, 2024<\/span><\/td><\/tr><\/tbody><\/table>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-460abe7 elementor-widget elementor-widget-text-editor\" data-id=\"460abe7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"color: #000000;\"><strong>IPO Reservation<\/strong><\/span><\/p><table><tbody><tr><td><span style=\"color: #000000;\"><strong><b>Investor Category<\/b><\/strong><\/span><\/td><td><span style=\"color: #000000;\"><strong><b>Shares Offered<\/b><\/strong><\/span><\/td><\/tr><tr><td><span style=\"color: #000000;\"><strong><b>QIB Shares Offered<\/b><\/strong><\/span><\/td><td><span style=\"color: #000000;\">Not more than 50.00% of the Net offer<\/span><\/td><\/tr><tr><td><span style=\"color: #000000;\"><strong><b>Retail Shares Offered<\/b><\/strong><\/span><\/td><td><span style=\"color: #000000;\">Not less than 35.00% of the Net Issue<\/span><\/td><\/tr><tr><td><span style=\"color: #000000;\"><strong><b>NII (HNI) Shares Offered<\/b><\/strong><\/span><\/td><td><span style=\"color: #000000;\">Not less than 15.00% of the Net Offer<\/span><\/td><\/tr><\/tbody><\/table>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-76068998 elementor-widget elementor-widget-text-editor\" data-id=\"76068998\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"color: #000000;\">To check allotment, <a href=\"https:\/\/linkintime.co.in\/Initial_Offer\/public-issues.html\" target=\"_blank\" rel=\"noopener\">click here<\/a><\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-612be76 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"612be76\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-a810130\" data-id=\"a810130\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-9f65433 elementor-align-center elementor-widget elementor-widget-button\" data-id=\"9f65433\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"elementor-button-wrapper\">\n\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"https:\/\/onelink.to\/449wqx\" target=\"_blank\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Apply for IPO<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"Garuda Construction and Engineering IPO is a book-built issue of Rs 264.10 crores. The issue is a combination&hellip;","protected":false},"author":5,"featured_media":40202,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"csco_display_header_overlay":false,"csco_singular_sidebar":"","csco_page_header_type":"","csco_page_load_nextpost":"","csco_post_video_location":[],"csco_post_video_location_hash":"","csco_post_video_url":"","csco_post_video_bg_start_time":0,"csco_post_video_bg_end_time":0,"csco_post_video_bg_volume":false,"footnotes":""},"categories":[15],"tags":[],"class_list":{"0":"post-40185","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-ipos","8":"cs-entry","9":"cs-video-wrap"},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Garuda Construction and Engineering IPO - Flattrade Kosh<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/flattrade.in\/kosh\/garuda-construction-and-engineering-ipo\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Garuda Construction and Engineering IPO - Flattrade Kosh\" \/>\n<meta property=\"og:description\" content=\"Garuda Construction and Engineering IPO is a book-built issue of Rs 264.10 crores. The issue is a combination&hellip;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/flattrade.in\/kosh\/garuda-construction-and-engineering-ipo\/\" \/>\n<meta property=\"og:site_name\" content=\"Flattrade Kosh\" \/>\n<meta property=\"article:published_time\" content=\"2024-10-08T05:37:55+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/flattrade.in\/kosh\/wp-content\/uploads\/2024\/10\/garuda-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1438\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Flattrade\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Flattrade\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/flattrade.in\/kosh\/garuda-construction-and-engineering-ipo\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/flattrade.in\/kosh\/garuda-construction-and-engineering-ipo\/\"},\"author\":{\"name\":\"Flattrade\",\"@id\":\"https:\/\/flattrade.in\/kosh\/#\/schema\/person\/0df49afdcdc9b8cf2e54f80cbc763e04\"},\"headline\":\"Garuda Construction and Engineering IPO\",\"datePublished\":\"2024-10-08T05:37:55+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/flattrade.in\/kosh\/garuda-construction-and-engineering-ipo\/\"},\"wordCount\":506,\"image\":{\"@id\":\"https:\/\/flattrade.in\/kosh\/garuda-construction-and-engineering-ipo\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/flattrade.in\/kosh\/wp-content\/uploads\/2024\/10\/garuda-scaled.jpg\",\"articleSection\":[\"IPOs\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/flattrade.in\/kosh\/garuda-construction-and-engineering-ipo\/\",\"url\":\"https:\/\/flattrade.in\/kosh\/garuda-construction-and-engineering-ipo\/\",\"name\":\"Garuda Construction and Engineering IPO - Flattrade Kosh\",\"isPartOf\":{\"@id\":\"https:\/\/flattrade.in\/kosh\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/flattrade.in\/kosh\/garuda-construction-and-engineering-ipo\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/flattrade.in\/kosh\/garuda-construction-and-engineering-ipo\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/flattrade.in\/kosh\/wp-content\/uploads\/2024\/10\/garuda-scaled.jpg\",\"datePublished\":\"2024-10-08T05:37:55+00:00\",\"author\":{\"@id\":\"https:\/\/flattrade.in\/kosh\/#\/schema\/person\/0df49afdcdc9b8cf2e54f80cbc763e04\"},\"breadcrumb\":{\"@id\":\"https:\/\/flattrade.in\/kosh\/garuda-construction-and-engineering-ipo\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/flattrade.in\/kosh\/garuda-construction-and-engineering-ipo\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/flattrade.in\/kosh\/garuda-construction-and-engineering-ipo\/#primaryimage\",\"url\":\"https:\/\/flattrade.in\/kosh\/wp-content\/uploads\/2024\/10\/garuda-scaled.jpg\",\"contentUrl\":\"https:\/\/flattrade.in\/kosh\/wp-content\/uploads\/2024\/10\/garuda-scaled.jpg\",\"width\":2560,\"height\":1438},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/flattrade.in\/kosh\/garuda-construction-and-engineering-ipo\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/flattrade.in\/kosh\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Garuda Construction and Engineering IPO\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/flattrade.in\/kosh\/#website\",\"url\":\"https:\/\/flattrade.in\/kosh\/\",\"name\":\"Flattrade Kosh\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/flattrade.in\/kosh\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/flattrade.in\/kosh\/#\/schema\/person\/0df49afdcdc9b8cf2e54f80cbc763e04\",\"name\":\"Flattrade\",\"url\":\"https:\/\/flattrade.in\/kosh\/author\/siddharth-aflattrade-in\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Garuda Construction and Engineering IPO - Flattrade Kosh","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/flattrade.in\/kosh\/garuda-construction-and-engineering-ipo\/","og_locale":"en_US","og_type":"article","og_title":"Garuda Construction and Engineering IPO - Flattrade Kosh","og_description":"Garuda Construction and Engineering IPO is a book-built issue of Rs 264.10 crores. The issue is a combination&hellip;","og_url":"https:\/\/flattrade.in\/kosh\/garuda-construction-and-engineering-ipo\/","og_site_name":"Flattrade Kosh","article_published_time":"2024-10-08T05:37:55+00:00","og_image":[{"width":2560,"height":1438,"url":"https:\/\/flattrade.in\/kosh\/wp-content\/uploads\/2024\/10\/garuda-scaled.jpg","type":"image\/jpeg"}],"author":"Flattrade","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Flattrade","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/flattrade.in\/kosh\/garuda-construction-and-engineering-ipo\/#article","isPartOf":{"@id":"https:\/\/flattrade.in\/kosh\/garuda-construction-and-engineering-ipo\/"},"author":{"name":"Flattrade","@id":"https:\/\/flattrade.in\/kosh\/#\/schema\/person\/0df49afdcdc9b8cf2e54f80cbc763e04"},"headline":"Garuda Construction and Engineering IPO","datePublished":"2024-10-08T05:37:55+00:00","mainEntityOfPage":{"@id":"https:\/\/flattrade.in\/kosh\/garuda-construction-and-engineering-ipo\/"},"wordCount":506,"image":{"@id":"https:\/\/flattrade.in\/kosh\/garuda-construction-and-engineering-ipo\/#primaryimage"},"thumbnailUrl":"https:\/\/flattrade.in\/kosh\/wp-content\/uploads\/2024\/10\/garuda-scaled.jpg","articleSection":["IPOs"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/flattrade.in\/kosh\/garuda-construction-and-engineering-ipo\/","url":"https:\/\/flattrade.in\/kosh\/garuda-construction-and-engineering-ipo\/","name":"Garuda Construction and Engineering IPO - Flattrade Kosh","isPartOf":{"@id":"https:\/\/flattrade.in\/kosh\/#website"},"primaryImageOfPage":{"@id":"https:\/\/flattrade.in\/kosh\/garuda-construction-and-engineering-ipo\/#primaryimage"},"image":{"@id":"https:\/\/flattrade.in\/kosh\/garuda-construction-and-engineering-ipo\/#primaryimage"},"thumbnailUrl":"https:\/\/flattrade.in\/kosh\/wp-content\/uploads\/2024\/10\/garuda-scaled.jpg","datePublished":"2024-10-08T05:37:55+00:00","author":{"@id":"https:\/\/flattrade.in\/kosh\/#\/schema\/person\/0df49afdcdc9b8cf2e54f80cbc763e04"},"breadcrumb":{"@id":"https:\/\/flattrade.in\/kosh\/garuda-construction-and-engineering-ipo\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/flattrade.in\/kosh\/garuda-construction-and-engineering-ipo\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/flattrade.in\/kosh\/garuda-construction-and-engineering-ipo\/#primaryimage","url":"https:\/\/flattrade.in\/kosh\/wp-content\/uploads\/2024\/10\/garuda-scaled.jpg","contentUrl":"https:\/\/flattrade.in\/kosh\/wp-content\/uploads\/2024\/10\/garuda-scaled.jpg","width":2560,"height":1438},{"@type":"BreadcrumbList","@id":"https:\/\/flattrade.in\/kosh\/garuda-construction-and-engineering-ipo\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/flattrade.in\/kosh\/"},{"@type":"ListItem","position":2,"name":"Garuda Construction and Engineering IPO"}]},{"@type":"WebSite","@id":"https:\/\/flattrade.in\/kosh\/#website","url":"https:\/\/flattrade.in\/kosh\/","name":"Flattrade Kosh","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/flattrade.in\/kosh\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/flattrade.in\/kosh\/#\/schema\/person\/0df49afdcdc9b8cf2e54f80cbc763e04","name":"Flattrade","url":"https:\/\/flattrade.in\/kosh\/author\/siddharth-aflattrade-in\/"}]}},"_links":{"self":[{"href":"https:\/\/flattrade.in\/kosh\/wp-json\/wp\/v2\/posts\/40185","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/flattrade.in\/kosh\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/flattrade.in\/kosh\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/flattrade.in\/kosh\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/flattrade.in\/kosh\/wp-json\/wp\/v2\/comments?post=40185"}],"version-history":[{"count":0,"href":"https:\/\/flattrade.in\/kosh\/wp-json\/wp\/v2\/posts\/40185\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/flattrade.in\/kosh\/wp-json\/wp\/v2\/media\/40202"}],"wp:attachment":[{"href":"https:\/\/flattrade.in\/kosh\/wp-json\/wp\/v2\/media?parent=40185"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/flattrade.in\/kosh\/wp-json\/wp\/v2\/categories?post=40185"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/flattrade.in\/kosh\/wp-json\/wp\/v2\/tags?post=40185"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}